Get users current date

I need to check what’s the current date where the user is in. I don’t need the time, just the current date. How can i do it? I'm using codeigniter. Thanks. I've managed to get the date on the client side. My problem is that i get an error (0) when trying to parse it using strtotime. I know that means the string is not ok but when i do an echo it displays ok(07/11/2010). Here's the code: javascript: function getthedate(){ var mydate=new Date() var year=mydate.getYear() if (year HTML: $c

groovy how to get next month from given date

Hi can anybody please help me in this. I want to display all the months from a given specific date. for Eg: given date is: 15-Mar-2011 Output should be: Mar/2011,Apr/2011 .... Feb/2012 How can i acheive the above in groovy?

How do I check if a date in format "yyyymmdd" is a weekday or not?

My program accepts date in the format of "yyyymmdd", I don't know how to check if it's a weekday or not. I've seen ppl using $(date +%u) -gt 5 or "$(date +%a)" in Sat|Sun echo "weekend" in other threads, but that ${date} is like Tue Nov 22 14:16:35 EST 2011 I guess. So is there a good way to convert "yyyymmdd" to ${date} format? Or is there a simple way to check if "yyyymmdd" is a weekday or not? Any language is fine. Thanks.

Subtracting a date from SYSDATE in ORACLE

Subtracting a date from SYSDATE gives negative results: select floor(SYSDATE - dateemb) from pilote; FLOOR(SYSDATE-DATEEMB) ---------------------- -29126 -29137 -29522 any solution to this? table pilote: Name Null? Type ----------------------------------------- -------- ---------------------------- NUMPIL NOT NULL NUMBER NOMPIL

Matplotlib: Formatting date in day.month.year style

I want to plot some lines with the date on the x axis, but all examples I could find use the American style like 12-31-2012. But I want 31.12.2012, but it doesn't seem to work by just changing the date formatter from dateFormatter = dates.DateFormatter('%Y-%m-%d') to dateFormatter = dates.DateFormatter('%d.%m.%y') My date list works like this: I want to define a "firstDay" manually, and then generate X succeeding days. That works as I can see when I print that result list. But when I want

Localized Date (LongDatePattern) Remove the year

I have this code to retrieve the Localized Date: DateTime.Now.ToString(DateTimeFormatInfo.CurrentInfo.LongDatePattern); The thing is that it returns the year also. I don't want the year. So I thought I could remove the year pattern from the LongDatePattern. But there are commas in some countries and it would look bad if I removed the 2013 year. Can someone help me to be able to do it?

Date Go language time.Parse() for timestamps with no timezone

In Go I'm trying to use the time.Parse() function from the time package to convert a string timestamp into a Time object. I know Go has an uncommon way of representing the time format your timestamps are in by providing it with an example of how their reference time (Mon Jan 2 15:04:05 -0700 MST 2006) would be displayed in your format. I'm still having issues with errors however. Here is an example of one of my timestamps: Tue Nov 27 09:09:29 UTC 2012 Here is what the call I'm making looks

Sql Server Greater than and equals date

I have dates in database. 2013-12-28 00:00:00.000 2013-12-28 00:00:00.000 I wrote a stored procedure for matching Datetime.Now and my database rows. My stored procedure Alter PROCEDURE SP_MATCH_DATE ( getdate() ( Year-Month-Day) ) AS BEGIN SELECT * FROM MY_TABLE WITH (NOLOCK) WHERE Dates = getdate() and Dates > getdate() END I want to set @DATETIME_NOW from getdate(). After that I want to match getdate() to Dates (Year-Month-Day) and getdate() > Dates

VMWare how to prevent a virtual machine from updating its date and time

I want to know how virtual machines (VMWare) updates their date and time and how to disable this; because i noticed that even if i suspend/shutdown a virtual machine for a year when i'll turn it on again, it will have the right time and date. For physical machines i know there is a little battery inside the Central Unit fixed on the Motherboard that helps to keep date when the computer is turned off and disconnected from powersupply. But what about virtual machines how do they keep their time

Using SAS to read Julian date separated by a period

I am using SAS 9.2 attempting to read the data from an IDCAMS utility report that lists information about z/OS mainframe datasets. The dates are in the format yyyy.jjj where yyyy is the four digit year and jjj is the Julian day of the year. The period is the problem, as standard SAS INFORMATS don't like it. How would I read such a date? Sample code: DATA ALL smflist (KEEP=DSNAME volser) ; LENGTH dsname $ 44. volser $ 6. createdt 8.; INFILE SYSPRINT LENGTH=LEN;

SSRS expression, iif statement with date conditions

So my default values for startDate and endDate in SSRS were set up with the following ssrs expressions. first day of previous month ssrs expression =DateAdd(DateInterval.Month, -1, DateSerial(Year(Date.Now), Month(Date.Now), 1)) last day of previous month ssrs expression =DateAdd(DateInterval.Day, -1, DateSerial(Year(Date.Now), Month(Date.Now), 1)) But that won't work alone in my case unless I want to go in on the 16th of every month and generate this report for the people requesting it

Date Increment Integer with leading zero

How do I increment an integer without losing the leading zero? here is my code. for i = week1From to week1To dayWeek1(ctr)=i ctr=ctr+1 next If my variables are this. week1From = 03 week1To = 07 the result would dayWeek1(1) = 3 dayWeek1(2) = 4 dayWeek1(3) = 5 dayweek1(4) = 6 dayWeek1(5) = 7 how can i make it like this? dayWeek1(1) = 03 dayWeek1(2) = 04 dayWeek1(3) = 05 dayweek1(4) = 06 dayWeek1(5) = 07

crystal reports month date range for earnings

My client has a report that accepts a date range to get a report showing projected revenue. So, a user would enter a date range of '1/1/2015 to 1/31/2015' and the report should return data only in the range '1/1/2015 to 1/31/2015 grouped by week. I am instead for the week of 12/29/2014 (which 1/1/2015 fall into) and 2/1/2015 (which 1/31/2015 falls into). The report is intended to group by week, but I do not want days on the report that are earlier than the start date parameter or later than the

PowerShell Get-Date into Switch Statement

I'm trying to create a SWITCH statement in PowerShell to run different code blocks based on DayOfWeek from Get-Date and I thought I had it working until I tested by setting a specific date, I found the code wasn't working as expected. In the perfect world, the script will be run on Monday. My goal is to output three variables in these formats 2/02/2015 1:00 AM 2015-02-02 MONDAY basically adding one day from Monday until Monday of next week. The problem comes from my trying to anticipate the s

Mule - Date format from m/dd/yy to yyyy-mm-dd

want to convert date to the above required format. Is it possible to write a groovy script to do so in datamapper? If yes can you please give an example. Or can i reference another expression or component?

Date converter using columns of dataTable primefaces

I'm using primefaces and I have a datatable witch contains 3 columns: DateStart, DateEnd, and NombreOfDay, I want to get the difference between the DateStart and DateEnd and put the result on NombreOfDay, this is what I try to do : <p:dataTable var="demande" value="#{myBean.allDemandes}"> <p:column headerText="Start:" > <h:outputText value="#{myBean.dateStart}" > <f:convertDateTime type="date" pattern="dd.MM.yyyy" timeZone="CET" /> </h:outputText></p:co

KSH - Check if date is in BST/GMT and perform calculations

I have a small KSH that performs what seems to be, on the surface, a relatively simple function. A date gets passed in (in the format YYYYMMDD), and this checks whether it falls within BST. If it is within BST, 5 hours is added to it and assigned to "BST_START_DATE", and 29 hours is added to assign to "BST_END_DATE". If not, 6/30 hours are added. So for example, if the date was 20150330, you would get the following: BST_START_DATE:2015033005 BST_END_DATE:2015033105 This generally works fine,

Date Cell in Google Spreadsheet yields integer in script

I have a column in a Google Spreadsheet that displays dates. The sheet was originally created in Excel, then copied to Google. The column of dates was originally filled using a 7 day step; each date is a Sunday. In the spreadsheet, it is formatted M/D/YYYY (7/5/2015). I am working on a script wherein the user selects a date cell, and a group of documents is generated based on the information in the subsequent columns of the row that contains the selected date. The problem is that when the

Date SQL insert unix timestamp with milliseconds

Can unix timestamps contain the milliseconds value of the time? If so, using SQL Server 2008 R2: CREATE TABLE [dbo].[my_table_calls_log] ( [id] [bigint] IDENTITY(1,1) NOT NULL, [requestdate] [bigint] NULL, [partycode] [bigint] NULL, CONSTRAINT [PK_my_table_calls_log] PRIMARY KEY CLUSTERED ([id] ASC) ) The following select gives me the current date and time with milliseconds: SELECT CONVERT(VARCHAR,SYSDATETIME(),121); Example: 2015-09-11 13:29:02.8239061 How do I c

Date Access Criteria Problems

I have an access database which is basically a downtime log holds information like date / start / end / duration / department / area / Okay, so I have a problem with the date part. In my query, I used an expression to abstract the date from the field start using format([start]-0.25,"DD/MM/YYYY") The -0.25 is an indicator that checks if the time is between 00:00:00 and 06:00:00 if so gives the previous day's date. From this field, I base a report which uses form filters to filter out by the da

Change date format in Swift

I have a date format in String value of "2015-08-27" which is "YYYY-MM-DD". I need to convert this to Date format and change the format to "DD-MMM-YYYY". And change it back to String format again to display. So the end result would be "27-AUG-2015". I have been searching for codes, but couldn't find one.

SAS Call Symput - INTNX returning inconsistent dates

I'm trying to use the call symput below to grab the most recent Friday and Sunday from the previous week. For example, if I run it today (5/17/2016) then it should grab 5/13/2016 and 5/15/2016. However, I'm getting strange results. The first time I run this piece of code, it results in no dates, or it results in 5/6/2016 and 5/8/2016. If I immediately run the same piece of code again then it provides the correct dates. This happens every time I open a new SAS session. Not sure what I am doing wr

How to add minutes to a date time value in orientdb

I want to add 5 minutes to a date time value and update the field. like below. checkintime is a date time type. How do I do it in orientdb? update employee set checkintime=sysdate()+5 return after

Shieldui datepicker restrictions

I try to get current year in calendar.. now year is 2016 so i don't want past years and future years only want current year ... and also month is June or any other month so i don't future months only want current and past months . when year 2017 then in calendar must be year 2017 ..when month is June or any other month then not able to select future months .. we only select only current month and past months according to year e,g, current month is June so Jan 2016.... June 2016 this is what i

How do you parse date in the format:

It's not clear to me from the documentation how I would parse a date in this somewhat strange format. It seems like it might not be possible. 2016-07-08T08:34:24+00:00 The following does not work (go play link) package main import ( "fmt" "time" ) func main() { date := "2016-07-08T08:34:24+00:00" d, err := time.Parse("2006-01-02T15:04:05+07:00", date) if err == nil { fmt.Println(d) } else { fmt.Println(err) } } Obviously a regexp could first ch

d3 date/time plotting out by 100 years

Can anyone help a beginner d3'er? I've created a scatter plot using d3 that shows Filing Date (of a Document Family) on the x-axis, and # family Members on the y-axis. Dots are all the same radius and are colour coded by Status. I have 300+ data records in a csv file format and all but the first 4 of them plot perfectly. All dates are post 1900. Included below are the first 9 lines of the csv data set.(I've used line breaks here to make it a bit more readable). The first 4 records are pl

How to solve "Conversion Error setting value '2013-10-26' for 'null Converter'" in h:inputText with Date value?

when I press the insert button, I get the error indicated on the title Conversion Error setting value '2013-10-26' for 'null Converter' <h:form id="formulario"> <h:outputLabel for="date">Plazo</h:outputLabel> <h:inputText id="date" required="true" requiredMessage="Campo Obligatorio" value="#{aaaNewDetalles.criterioAaa.plazo}"/> <h:message for="date" style="color: red;"/> <h:commandButton actionListener="#{aaaNewDetalles.add()}" value="Ingresar"

How to insert row data between consecutive dates in HIVE?

Sample Data: customer txn_date tag A 1-Jan-17 1 A 2-Jan-17 1 A 4-Jan-17 1 A 5-Jan-17 0 B 3-Jan-17 1 B 5-Jan-17 0 Need to fill every missing txn_date between date range (1-Jan-17 to 5-Jan-2017). Just like below: Output should be: customer txn_date tag A 1-Jan-17 1 A 2-Jan-17 1 A 3-Jan-17 0 (inserted) A 4-Jan-17

Can I set an endDate to n/a in Schema.org SaleEvent?

I am trying to find the correct way of setting the endDate in a Schema.org SaleEvent. Right now this is what I am doing, but I'm wondering if this is the correct way? I'm actually still waiting for Google to show these results, so I can't test if it works yet. <script type="application/ld+json"> { "@context": "http://schema.org", "@type": "SaleEvent", "name": "<?=$obj->title;?>", "url": "<?=$fun_domain.'/'.$fun_shop_page.'/'.$shop_slug;?>", "startDate":

Mismatch of date while using date format for specific date in swift 3

If the date is Mar 31, 2017 11:59:59 PM , If I use var dateFormatter: DateFormatter = { let formatter = DateFormatter() formatter.dateFormat = "MMM d,yyyy HH:mm:ss a" return formatter }() above format and after converting seconds, that seconds represent the date Mar 31, 2017 12:59:59 PM cellbidEndseconds = (Int)((dateFormatter.date(from:arrMap_biddingDateEnd[indexPath.row])?.timeIntervalSince1970)!) Where was the error, Can someone figure it out and up

Get Number of Occurrences Based on Date Range and Set Days of Week

I am trying to calculate the total number of events that would occur based on the following known parameters start date end date Days of the week frequency of weeks (every week, every 2 weeks, etc) For example, based on the following example data: 05/01/2017 05/31/2017 1,4 (Sunday, Wednesday) Every 2 weeks I would have to calculate that this event would run four times (5/7, 5/10, 5/21, 5/24) Below is the skeleton I have set up. I'm fully stumped on how to increment the current day in th

Date unix timestamp: not getting the correct year value by dividing

I'm attempting to extract years from the timestamp, as indicated below: const int timestamp = 1499477613; int hours = timestamp/3600; int days = hours/24; int years = days/356; printf("years=%i\n", years); However after executing the program, I get an output saying: years=48 Which is different from the expected value 2017. What's wrong with the code?

Date Wrong calculate error between two hours in swift 2

I have firstHour Example, 12:03, secondHour Example, 21:56 , End output gives; 9.88 88 bigger than 60 minutes this is error, how can i fix it ? My codes under below. let calendar = NSCalendar.currentCalendar() if firstHour != nil && secondHour != nil { let dateComponents = calendar.components(NSCalendarUnit.Minute, fromDate: firstHour!, toDate: secondHour!, options: []) let seconds : Double = Double(dateComponents.minute) let clean : Double = (seconds / 60.0)

input date mm/dd/yy without using scanf function?

As I read, using scanf can cause problems so I want to avoid using it in practice. How else can I take input from user in mm/dd/yy format (which is good practice) ? Preferably in not too many steps.

Date Format timestamp value using Spark Dataframe API

I have a Dataframe with a date column representing Unix timestamp in String format. The column values need to be formatted to a different String representation as below - Input Dataframe +----+----+-------------+ |name|code| date| +----+----+-------------+ | A| 1|1545905416000| | B| 3|1545905416000| | C| 5|1545905416000| +----+----+-------------+ Expected output Dataframe +----+----+-------------+ |name|code| date| +----+----+-------------+ | A| 1| 2018-12-

Difference between two dates expressed as years, months, days (in one column)

I have a set of columns set up in Google Sheets that display the difference between two dates using the DATEDIF function: =DATEDIF (AS2, TODAY(), "D") (number of days passed today since a certain date) =DATEDIF (AR11, AS11, "D") (number of days passed between two certain dates) The values are represented as a number (of days). This is fine for shorter durations, but for something like 987 days I would like to display the value into something more intuitive, such as: | 2 Years, 8 months,

Google Sheets: Automatically Increment Date by 1 Month

I am currently using a budget sheet that automatically updates date cells to the next "payment" date for a bill. As an example: =VALUE("2019-03-08")+14*FLOOR((NOW()-VALUE("2019-03-08"))/14) The cell starts with a date and it then updates every 14 days to the new date. This shows me a cell that has the date of the biweekly payment that is due. In the above example, the cell shows the value of "2019-03-08" until 2 weeks have passed. Once 14 days have passed, the cell will automatically uplo

How to apply a filter on date fields in UltraEdit

I am trying to use the filter option in UltraEdit. I have a simple CSV file. It has 3 columns. The last column has dates. I need to apply a filter so that I see only those lines with dates older than, say, 05/01/2019. 24.59,000000024.13,06/01/2019 18.45,000000000.00,07/01/2019 18.45,000000018.36,07/01/2019 94.08,000000000.00,02/01/2019 19.83,000000000.00,02/01/2019 77.35,000000000.00,02/01/2019 51.22,000000000.00,02/01/2019 14.02,000000000.00,02/01/2019 70.21,000000000.00,02/01/2019 25.24,00000

Scripting date format

I am trying to read a date from a cell for example 28-Jun-19 in cell A1, 17/01/2019 in cell A2 and write it to another sheet through script. The format I need is "mm/dd/yy" but my output is 6/28/2019, 12:00:00 AM. A1 A2 ------ -------- 28-Jun-19 17/01/2019 I have not included the loops in the codes below:- var A_Date = targetSheet1.getRange(lastRow -i, 2).getValues().toLocaleString(); sourceSheetalpha.getRange(lastRow2 + 1, 13).setValue(A_Date); I expected output 28/06

Converting Integer values to Date in Presto SQL

Below is a script i am trying to run in Presto; Subtracting today's date from an integer field I am attempting to convert to date. To get the exacts days between. Unfortunately, it seems the highlighted block does not always convert the date correctly and my final answer is not correct. Please does anyone know another way around this or a standard method on presto of converting integer values to date. Interger value in the column is in the format '20191123' for year-month-date select ms, acti

Date comparison Logic / in Liquid Filter

I'm trying to add 30 days to a pre-order date and if today's date is later, display a text string and if not display another text string. Any ideas where I'm going wrong? {% assign assign pre_date = 259200 | plus: order.created_at | date: '%s' %} {% assign today_date = 'now' | date: '%s' %} {% if pre_date > today_date %} disply this {% else %} this {% endif %}

Date COUNTIFS Greater/Less Than Logic Always Returns 0

We're trying to create a sort of filtering system that allows us to filter spreadsheet entries that include a start and end date. We'd like to filter these entries by date (start and end) so we can pull dynamic averages. We're almost there, though it seems the logic for 'greater/lesser than this date' is not working properly, the result is always 0 after applying the greater/lesser than logic. We tried using just greater-than/lesser-than themselves during troubleshooting and both result in 0. B

Date Similar arrayformula working, non-array formula working, why not this arrayformula?

This arrayformula works in my spreadsheet: =arrayformula(IF(A3:A<>"", DATEDIF(H3:H,"01/01/21","m"), "")) This non-array is working: =DATEDIF(MAX(datevalue(H3), "1/1/2021"),"01/01/22","m") So I would think this would work as an arrayformula version of the working non-array: =arrayformula(IF(A3:A<>"", DATEDIF(MAX(datevalue(H3:H), "1/1/2021"),"01/01/22","m"), "")) Instead, I get this error: DATEVALUE parameter '' cannot be parsed to date/time. Can anyone please point me

Flutter Dart Error Format Timestep from Cloud_Firestore into Date

I Store the Meal and the Date in Cloud_Firestore. Getting it back, it looks like this shown on the Screen Show. I tried to formate the Timestamp with DateTime but this doesn't work. I also tried it with the intl.dart Package to format it, How can I parse the Timestamp and Format it into Year,Month and Day? Code import 'package:flutter/material.dart'; import 'package:mealapp/models/Widgets/whenAndWhatToEat.dart'; import 'package:cloud_firestore/cloud_firestore.dart'; import 'package:intl/intl.dar

How to handle DD/MM date time string in Vertica TO_TIMESTAMPTZ?

I have some date time strings with day first. When I try to convert to TIMESTAMPTZ the month seems to be ignored. Example TO_TIMESTAMPTZ('01/07/2020 04:00', 'DD/MM/YYYY HH:MM') Returns 2020-01-01T04:00:00.000+00:00 I'm looking for 1st July but get 1st January (not even 7th January!)

MDX calculated measures with date comparisons

I'm new of MDX and I'm trying to calculate a new measure based on two different date dimensions. I have the Creation Date Dimension (with Year, Trimester, Month, Day) and Resolution Date (with Year, Trimester, Month, Day).As measure I have the number of tickets and I want to calculate two new measures in order to know how many tickets that were resolved this month were actually created last month and how many tickets were resolved in the same month as they were created. I found this interesting

MS Access form conditional formatting of textbox based on date not working as expected

I have an Access DB I've been working on that tracks the preconstruction work for each project we are awarded. I've included a form that is a quick glance at the status of some of the initial tasks that need to be performed. The data source is a query that includes the award date and fields that calculate dates for each of the initial tasks. On the form, under each task I have a textbox tied to the calculated date and a checkbox tied to another field in the query indicating if the task is com

  1    2   3   4   5   6  ... 下一页 最后一页 共 20 页